With great pride we present our GRAND PROJECT!
A screen with an area of 764 square meters on the administrative building of the Moscow Metro! THE FEATURE OF THE PROJECT IS IN THE FORM OF A SCREEN (more precisely, two screens), one of which is bent along the radius. And also the need to choose a product that would fully comply with all the requirements of the FSO for electromagnetic radiation for the city of Moscow and have an EMC certificate. All these requirements were perfectly matched by the product we chose from the Lightking factory. A huge advantage of this product is its high brightness, clarity and picture quality, as well as a high degree of protection against moisture (which not all manufacturers can provide)
We must pay tribute to the customer, the Moscow Metro, who owns this unique building. Thank you for trusting our company and comfortable cooperation!
We also cannot fail to note that the administration of the city of Moscow wished that the New Year's address of the President of the Russian Federation be broadcast on our screen! Of course, we couldn't let you down! Our technical specialists, on the eve of the new year, set up the broadcast.
How else to delineate the border between the old and the new year, if not the President's message under the chiming clock? You can watch this moment in the video above. Such a landmark action, where patriotism and satisfaction from the work done are mixed, overwhelms us with pride!
For screen maintenance, we have created a convenient rear metal structure that allows you to walk behind the screen, so there is no need to hire climbers or an aerial platform to replace or repair any element. The peculiarity of this project was in the form of the media facade itself, one of its screens is bent along the radius, which greatly complicates the installation. Another difficulty was in adverse weather conditions. The work was carried out in the winter season at very low temperatures. Many years of experience of the XLED company allows us to solve absolutely any task of complexity, so our specialists completed the installation of this project at the highest level and in the shortest possible time (less than 30 days)!
BIG SQUARE
A distinctive feature of this project is that its area is 764 m2, which required a complex metal structure.
COMPLEX SCREEN FORM
Part of the media facade is curved along the radius, repeating the surface of the building, part of the modules were made curved along the radius
LIMITED TIME
Limited time frame for project implementation. The entire cycle of production, delivery and installation of this media facade took less than 120 days.
2. Logistics services for the supply of the screen and customs clearance of the product.
4. Service.
1. Screen selection advice. Field demonstration of the product. Examination of the installation site. Design project development, video and photo visualization.
3. Design and installation of metal structures and electrical networks. Screen installation and commissioning. Training.
The EA2531 EMC has a pixel pitch of 27.9 mm and a recommended viewing distance of 22 meters. Brightness 8000 candela. Type of installation - stationary, i.e. fastening systems do not require quick dismantling.